Skip to content
All prices on the website are VAT inclusive. B2B customers (except Belgium) can visit at https://business.proaim.be/ to get VAT Free pricing.
All prices on the website are VAT inclusive. B2B customers (except Belgium) can visit at https://business.proaim.be/ to get VAT Free pricing.

Flycam Starter Female Flowline Body Support Rig for Camera & Gimbals

Payload: 3-7.5kg (6-16lb)

Save 7% Save 7%
Original price €380,00
Original price €353,00 - Original price €380,00
Original price €380,00
Current price €353,00
€339,00 - €353,00
Current price €353,00
or Buy now, pay later. Choose Klarna Pay Later / Slice it during checkout.

SKU : B-FLCM-FLN-FM

Most Comfortable Female Body Rig

To Support Your Extensive Camera Handheld Work!

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
Flycam brings you the most comfortable Female Flowline to take the weight off your shoulders and arms and redistribute it across the entire back.
We understand that extended handheld camerawork proves to be a backbreaker, yet this is the most Comfortable and Breathable Body Harness.
NOTE: It is recommended to attach the minimum required weight (3kg/6lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Starter Female Flowline Body Support Rig for Camera & Gimbals

02.

SMOOTHER, STEADIER SHOTS!
The Harness takes the weight off your arms and shoulder, letting you hold the camera steady for a longer duration without fatigue, resulting in smoother and Steadier Shots.
The Top Bar with 180° Rotation capability allows easy camera movements at different angles.
The Support Rope also adds an additional point of contact that reduces Vibrations.

03.

THE MOST VERSATILE CAMERA SUPPORT RIG
This Female Flowline System comes in two sizes for different body types.
It easily accommodates all Camera and Gimbal Setups between 3 to 7.5kg (6 to 16lb).
The spring tension is adjustable to balance the load placed on the Support Rope by turning the knob present on the back of rig.

Flycam Starter Female Flowline Body Support Rig for Camera & Gimbals

IN-ACTION VIDEOS

SPECIFICATIONS

B-FLCM-FLN-FM (S, M, L)

Payload Capacity

Min-Max: 3kg - 7.5kg (6lb - 16lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

Arm Support Rotation

  180°

Flowline Height

  Mounted: 100cm | 39.4inch
  Folded: 60cm | 23.6inch

Flowline Weight

  4.6kg / 10.14lb

Suspension Line 

  Material: 3mm Nylon
  Length (Rope):152.5cm | 60inch when fully stretched

Top Bar Length

  560mm

Top Bar Rotation

  180°

Waist Size

  26inch - 32inch

Bust Size

  34inch - 38inch

Product  Weight (Without Packing)

  4.8kg / 10.5lb

Product Volumetric Weight (With Packing)

  19.4kg / 42.7lb

B-FLCM-FLN-FM-01 ( XL, XXL)

Payload Capacity

Min-Max: 3kg - 7.5kg (6lb - 16lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

Arm Support Rotation

  180°

Flowline Height

  Mounted: 100cm | 39.4inch
  Folded: 60cm | 23.6inch

Flowline Weight

  4.8kg / 10.58lb

Suspension Line

  Material: 3mm Nylon
  Length(Rope): 152.5cm | 60inch when fully stretched

Top Bar Length

  560mm

Top Bar Rotation

  180°

Waist Size

  32inch - 38inch

Bust Size

  42inch - 46inch

Product  Weight (Without Packing)

  5.1kg / 11.2lb

Product Volumetric Weight (With Packing)

  22.9kg / 50.4lb

IN THE BOX

B-FLCM-FLN-FM (S,M,L)

Flycam Starter Female Flowline for Small, Medium and Large Size
Bag Packing

B-FLCM-FLN-FM-01 (XL,XXL)

Flycam Starter Female Flowline for XL and XXL Size
Bag Packing


delivery

Guaranteed Fast Delivery
For all orders

customer service

Quick and Efficient
Customer service

easy returns

Easy Returns
Up to 30 days

warranty

1-Year Warranty
On All Products





  • Is this rig suitable for professional filmmaking?

    Yes, it’s widely used for both professional and independent productions.

  • Does it improve camera stability?

    Yes, it reduces shake and helps achieve smoother shots.

  • Is it compatible with DJI and Zhiyun gimbals?

    Yes, it supports most handheld gimbals within the weight range.

  • What weight does the Flycam Female Flowline support?

    The Female Flowline supports 3–7.5kg (6–16lb) camera and gimbal setups.

  • Does it restrict movement while shooting?

    No, the 180° rotating top bar allows free movement and flexible camera angles.

  • Can I adjust it for different camera weights?

    Yes, spring tension can be easily fine-tuned using the adjustment knob on the back.

  • Is this Rig size inclusive?

    Yes, it comes in two variants.
    B-FLCM-FLN-FM: For S, M & L
    B-FLCM-FLN-FM-01: For XL and XXL

  • Does it help stabilize shots?

    Yes, the support rope and balanced load help reduce vibrations for smoother, steadier footage.

  • Is this rig designed for female users?

    Yes, it’s ergonomically designed for female body types to ensure better comfort and fit during long shoots.

  • "I’m confused why this and some of the other vests say “female” what does this mean? What are the differences? Is it just the dimensions? I’m a man, do you think this fly cam will work for me?"

    We would like to inform you that, Flycam Starter Female Flowline Body Support Rig (B-FLCM-FLN-FM) is specially designed for females and is different from Flycam Flowline Starter (B-FLCM-FLN-01) in terms of the varying bust size.
    We would recommend you purchase the Flycam Flowline Starter (B-FLCM-FLN-01) instead.

x