Flycam Flowline Master with Pro Vest
AT A GLANCE
Vibration Reduction
Handheld Stabilization
Dynamic Camera Movement
Secure checkout | Fast delivery | 30-day returns | 1-year warranty
Secure checkout | Fast delivery | 30-day returns | 1-year warranty
Flycam Flowline Masterwith Pro Vest
To support your extensive handheld work, the Flycam Flowline Master with Pro Vest carries camera and gimbal setups from 4 to 12 kg (9 to 27 lb) and spreads the weight across your entire back. A multi-layer padded vest, a 180° rotating top bar and a vibration-reducing Support Rope keep long shoots smooth and comfortable.
01Weight distribution
We understand extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline Master takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
NoteIt is recommended to attach the minimum required weight (4 kg / 9 lb) for pulling down the Support Rope to ensure proper operation of your Flycam Flowline system.
02Padding & fit
The Flowline Master Vest has Multiple Layers of Padding which ensures more support around the waist, allowing you to mount large setups and shoot for longer duration comfortably.
It has a flexible belt system & adjustable vest rods on sides which will enable a comfortable fit for all body types.
03Stability
The Harness takes the weight off your neck, arms and shoulders, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots.
The Support Rope also adds a point of Contact which reduces Vibrations.
04Payload
This Flowline Master System fits multiple Camera and Gimbal Setups between the weight range of 4 kg / 9 lb to 12 kg / 27 lb. You can even adjust the spring tension to balance the load placed on the Support Rope by turning the knob present on the back of the rig.
Also, the top bar allows for 180° rotation to capture shots with incredible freedom of movement.
05Durability
We know set life can take a toll on your gear. Built with the highest quality materials, the Flycam Flowline Master is sure to last you a lifetime.
It comes in a high-quality protective bag that lets you easily carry it with you around the world.
06Specifications
FLCM-FLN-MSTR-03
| Payload Capacity | Min-Max: 4 kg - 12 kg (9 lb - 27 lb) |
|---|---|
| Note: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities. | |
| Support Arm Rotation | 180° |
| Knob Type | Anti Slip Ratchet Knob |
| Height Mounted | 100cm | 39.4inch Folded: 60cm | 23.6inch |
| Suspension Line | Material: 3mm Nylon Length (Rope): 152.5cm | 60 in When fully stretched |
| Top Bar | Length Including Extension: 46cm | 18inch Length Excluding Extension: 32cm | 13inch |
| Waist hip strap length | Min-Max: 87cm - 107cm (34inch-42inch) |
| Extension Length | 14cm | 5.5inch |
| Product Weight (without packing) | 5.6 kg / 12.5 lb |
| Product Weight (with packing) | 28 kg / 61.8 lb |
In the box
07Videos