Skip to content
All prices on the website are VAT inclusive. B2B customers with a valid VAT number (except Belgium) can visit at https://business.proaim.be/ to get VAT Free pricing.
All prices on the website are VAT inclusive. B2B customers with a valid VAT number (except Belgium) can visit at https://business.proaim.be/ to get VAT Free pricing.

Flycam Flowline Master Professional Support for Camera & Gimbals (4-12kg/9-27lb)

Save 7% Save 7%
Original price €992,00
Original price €992,00 - Original price €992,00
Original price €992,00
Current price €924,00
€924,00 - €924,00
Current price €924,00
or Buy now, pay later. Choose Klarna Pay Later / Slice it during checkout.

SKU : FLCM-FLN-MSTR-02

AT A GLANCE


Payload
4-12 kg
Support Arm Rotation
180°
Waist hip strap length
Min - Max: 81 cm - 125 cm
Compatible With
Camera and Gimbals
Best For
Moving Shots
Vibration Reduction
Handheld Stabilization
Dynamic Camera Movement

Secure checkout | Fast delivery | 30-day returns | 1-year warranty

Flycam Flowline MasterProfessional camera support

Let the Rig Take the Weight. You Focus on the Shot.

Built for camera and gimbal setups from 4 kg to 12 kg (9 lb to 27 lb), the Flycam Flowline Master takes much of the weight off your arms, letting you focus on guiding the shot. By distributing the load across your back and reducing vibrations, it helps deliver steadier handheld shots and smoother tracking movements with less fatigue during long shooting days.

Payload

4–12kg

9–27 lb

Camera and gimbals.

Support arm

180°

Rotation

For dynamic camera movement.

Waist hip strap

81–125cm

32–49 in

Fits all body types.

Operator wearing the Flycam Flowline Master with a cinema camera rig indoors

01The most comfortable shooting experience

Takes the weight off your shoulders.

Extended handheld camerawork takes a real toll on the body. The Flycam Flowline Master takes the weight off your shoulders and arms and redistributes it across the entire back through a comfortable, breathable body harness.

For proper operation, attach the minimum required weight of 4 kg / 9 lb to pull down the balancing rope.

HarnessComfortable & breathable
Full backWeight redistributed
4 kgMinimum rope load
Operator wearing the Flycam Flowline Master vest with a cinema camera rig on a hillside

02The Flowline Master vest

Comfort that lasts through long takes.

The ergonomically designed vest gives more support around the shoulders and back, so you can mount large setups and shoot comfortably for longer.

Its flexible belt system and adjustable vest rods on the sides enable a comfortable fit for all body types.

ErgonomicShoulders & back
32–49″Waist hip strap
AdjustableVest rods & belt
Operator walking in a park with the Flycam Flowline Master and a gimbal rig

03Adjusts to your load

Adaptive camera support rig.

The Flowline Master system fits multiple camera and gimbal setups from 4 kg/9 lb to 12 kg/27 lb. Turn the knob on the back of the rig to adjust the spring tension and balance the load on the support rope.

The top bar allows 180° rotation, giving you room for dynamic camera movement.

4–12 kgCamera & gimbal setups
Ratchet knobSpring tension
180°Top bar rotation
Operator crouching by the water with the Flycam Flowline Master and a gimbal rig

04Smoother steadier shots

Steadier shots, without the fatigue.

The harness takes the weight off your neck, arms and shoulders, so you can hold the camera steady for longer without fatigue and deliver smoother, steadier shots.

The support rope also adds a point of contact that reduces vibrations.

No fatigueNeck, arms & shoulders
Support ropeReduces vibrations
SteadyLonger takes
Operator filming an indoor scene with the Flycam Flowline Master

05Built to last

Made for life on set.

We know set life can take a toll on your gear. Built with the highest quality materials, the Flycam Flowline Master is sure to last you a lifetime.

It comes in a high-quality protective bag that lets you easily carry it with you around the world.

PremiumHighest quality materials
4.7 kgProduct weight
BagProtective carry bag

06In-action videos

See the Flycam Flowline Master in Action

Flycam Flowline Master in action

Flycam Flowline Master in action

07Specifications

Flycam Flowline Master · FLCM-FLN-MSTR-02

Payload CapacityMin-Max: 4kg - 12kg (9lb - 27lb)
Support Arm Rotation180°
Knob TypeAnti Slip Ratchet Knob
HeightMounted: 100cm | 39.4inch
Folded: 60cm | 23.6inch
Suspension LineMaterial: 3mm Nylon
Length (Rope): 152.5cm | 60inch when fully stretched
Top BarLength Including Extension: 46cm | 18inch
Length Excluding Extension: 32cm | 13inch
Waist hip strap lengthMin - Max: 81cm - 125cm (32inch - 49inch)
Extension Length14cm | 5.5inch
Product Weight (without packing)6.8kg / 14.9lb
Product Weight (with packing)18.5kg / 40.7lb

Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

In the box

  1. 01Flycam Flowline Master Professional Support for Camera & Gimbals (4kg-12kg / 9lb-27lb)
  2. 02Bag

User manual

Fast deliveryOn all orders
Quick supportEfficient customer service
Easy returnsUp to 30 days
1-year warrantyOn all products



  • What type of cameras can be used with this system?

    It works with DSLRs, cinema cameras, and gimbal setups.

  • Is it portable for travel shoots?

    Yes. It comes with a carry bag for easy transport.

  • Does it restrict camera movement?

    No. It allows free movement with 180° rotation support.

  • Can I use it with gimbals like Ronin or Movi?

    Yes. It supports most gimbals within the weight range.

  • What is the supported weight range of the Flowline Master?

    It supports 4 kg to 12 kg (9–27 lb) setups.

  • Can the tension be adjusted for different setups?

    Yes. Spring tension is easily adjustable using the rear tension control knob.

  • Can it fit different body types?

    The adjustable vest rods and flexible belt system allow a secure, comfortable fit for most users.

  • Is there a minimum weight requirement to use it properly?

    Yes. A minimum load of 4kg / 9lb is recommended to ensure proper rope tension and operation.

  • How do I adjust the height?

    The Flycam Flowline Master 2 Professional Support Vest for Cameras & Gimbals has an optional height riser for vertical extension of the top bar.
    It is Flycam Height Riser for Flowline Body Support Rigs (FLN-HR-4)

  • what is the difference between 180° and 360°?

    The only difference between the 180° and 360° model is the support arm rotation.

Customer Reviews
5.0 Based on 4 Reviews
Write a Review

Thank you for submitting a review!

Your input is very much appreciated. Share it with your friends so they can enjoy it too!

Filter Reviews:
AB
01/06/2021
adisa b.
Filmmaking with ease

This is my favorite piece of stablizing equipment.

SP
11/03/2021
Stelian P.
Switzerland Switzerland
Good product & superfast delivery

Good product, nice details & superfast delivery

MD
19/04/2020
Malyssa D.
AWESOME BUY

Great for cinematographers that like to go handle

JB
27/06/2019
Jiwon B.
Works Well!

I've never used an easyrig but this feels very secure and holds the weight of a moderately heavy rig nicely.

Newsletter sign-up

You can subscribe without accepting optional cookies.

By selecting Subscribe, you agree to receive Proaim product updates and offers by email. You can unsubscribe at any time. Privacy policy

x