Flycam Flowline Master 180° with Placid Stabilizing Arm for Camera & Gimbals (5-12kg/11-26lb)
AT A GLANCE
Vibration Reduction
Handheld Stabilization
Dynamic Camera Movement
Secure checkout | Fast delivery | 30-day returns | 1-year warranty
Secure checkout | Fast delivery | 30-day returns | 1-year warranty
Flycam Flowline Master 180°With Placid stabilizing arm
Built for camera and gimbal setups from 5 kg to 12 kg (11 lb to 26 lb), the Flycam Flowline Master 180° with Placid Stabilizing Arm gives your body the support and your shots the stability. The vest handles the load, the 2-axis Placid arm handles the motion, and together they deliver smoother tracking and dynamic shots across moving shots, vibration reduction, handheld stabilization and dynamic camera movement.
Payload
5–12kg11–26 lb
Camera and gimbals.
Top bar
180°Rotation
Placid adds 40° tilt.
Waist hip strap
81–125cm32–49 in
Fits all body types.
01Takes the weight off your shoulders
Flycam understands the pain of Film-makers & brings you the most iconic combination of Flycam Flowline Master with Placid Arm. The extended handheld camerawork can prove to be a backbreaker that would result in fatigue & distorted shots.
The Flowline takes the weight off your shoulders & arms and redistributes it across the entire back, and the Placid Arm absorbs the distortion & delivers silky smooth shots.
Note: It is recommended to attach the minimum required weight 5 kg / 11 lb for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.
02Vest support meets two-axis stabilization
The Flycam Flowline Master Vest ensures more support around the Shoulders and Back while accessing Cameras, Camcorders & Gimbals and lets you shoot comfortably for a longer duration.
At the same time, Flycam Placid is a 2-axis Spring Arm that attaches to the end of your Flycam Flowline, stabilizes and smoothens the shots while moving or running.
The Flycam Placid pivots around its axis and provides side to side stabilization along with Vertical Stabilization.
03Fine-tuned to your rig
The Flycam Flowline adjusts to balance the load placed on the Support Rope by turning the knob present on the rig's back.
And the Placid Arm elements like the Interchangeable Spring Mechanism and the Easy Adjustment Knob lets you easily adjust its tension to balance the setup.
04Steadier shots, without the fatigue
This mechanical combination is a perfect solution for filmmakers. It lets you work in challenging locations for longer hours where you cannot use electronic equipment.
It allows you to be flexible & more creative in your shots; you can quickly take high & low shots with the help of this combination.
05Aluminum alloy / Stainless steel springs
We know the Film-maker's life takes a toll on your gear. Yet this combination of Flycam Flowline Master with Stabilizing Placid Arm is built with the highest quality material.
The Placid Arm has been built using robust Aluminum Alloy. The springs used in this are made up of Stainless Steel which gives strength and stability.
And the Flycam Flowline Body Support Vest and Placid Arm is cleverly designed to guarantee it will work correctly and smoothly year in and year out.
06In-action videos
07Specifications
Flycam Flowline
| Flowline Weight | Complete 3.6 kg / 8 lb |
|---|---|
| Height | Mounted: 100cm | 39.4inch Folded: 60cm | 23.6inch |
| Suspension Line | Material: 3mm Nylon Length (Rope): 152.5 cm (60") when fully stretched |
| Top Bar | Length: 56cm Rotation: 180° |
| Waist Hip Strap Length | Min-Max: 81cm - 125cm (32inch - 49inch) |
| Tilt Range | 40° Up/ Down |
| Side to Side Movement | 180° |
Placid Arm
| Construction | Aluminum, Carbon Steel, Stainless Steel, EPDM rubber |
|---|---|
| Dimensions | Height: 20.5cm Width: 39.5cm Depth: 6.5cm |
| Weight | 1.80 kg / 3.96 lb |
| Packing Dimensions (LxWxH) | 42 x 20.5 x 12cm |
| Packing Weight | 2.40 kg / 5.28 lb |
In the box · FLCM-FLN-MSTR-PLA-01
User manual