Flycam Flowline Professional Series 5-12kg / 11-26lb
Ergonomic Body Support for Camera & Gimbals
AT A GLANCE
On-Set Workflows
Equipment Organization
Secure checkout | Fast delivery | 30-day returns | 1-year warranty
Secure checkout | Fast delivery | 30-day returns | 1-year warranty
Flycam FlowlineProfessional series camera support
Enjoy greater comfort and control during extended shoots with the Flycam Flowline Professional Series. Available in three variants supporting camera and gimbal setups from 5–12 kg (11–26.4 lb), it redistributes weight across your back to reduce arm and shoulder strain. Its 360° rotating support arm and adjustable, padded harness allow greater freedom of movement and comfort on set.

01Comfort
We understand extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
NOTE: It is recommended to attach the minimum required weight for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

02Fit & padding
The Flowline Vest has Multiple Layers of Padding which ensures more support around the waist, allowing you to mount large setups and shoot for longer duration comfortably. It has a flexible belt system & adjustable vest rods on sides which will enable a comfortable fit for waist sizes from 28 in to 56 in.
Note: The vest may come with either red or black stitching, depending on stock availability.

03Stability
The Harness takes the weight off your neck, arms and shoulders, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Support Rope also adds a point of Contact which reduces Vibrations.

04Models & payload
This page offers three Flowline models: 300N (5–8 kg), 400N (8–10 kg), and 500N (10–12 kg). Choose the one that matches your camera and gimbal payload. Integrated gas springs self-balance the load, leaving you free to concentrate on the shot.
The Height adjustable support bar enables you to adjust the height of the support arm according to your requirement. The top bar also allows for 360° rotation to capture shots with incredible freedom of movement.

05Durability
We know set life can take a toll on your gear. Built with the highest quality materials and custom-designed Gas Springs, the Flycam Flowline is sure to last you a lifetime. It comes in a high-quality protective bag that lets you easily carry it with you around the world.
06Specifications
Flycam Flowline
| Payload Capacity (Min-Max) | Flowline 300N: 5 kg - 8 kg (11 lb - 17.6 lb) Flowline 400N: 8 kg - 10 kg (17.6 lb - 22 lb) Flowline 500N: 10 kg - 12 kg (22 lb - 26.4 lb) |
|---|---|
| Construction | High-Grade CNC Aluminum And Fabric |
| Support Arm Rotation | 360° |
| Height | Mounted: 43.5inch Folded: 27inch |
| Suspension line | 107cm | 42inch when fully stretched |
| Waist Size | 28inch - 56inch |
| Product Weight (without packing) | 4.4 Kg |
| Product Volumetric Weight (With packing) | 23.4 Kg |
Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.
In the box
Dimensions · Flowline 300N / 400N / 500N

FLCM-FLN-300N · FLCM-FLN-400N · FLCM-FLN-500N
07In-action videos