Skip to content
Our Biggest Sale of the Year: Up to 15% Off. Auto-applied at Checkout.
Up to 15% OFF. Auto-applied at Checkout.

Flycam Flowline Master with Pro Vest

Save 25% Save 25%
Original price €1.181,00
Original price €1.181,00 - Original price €1.181,00
Original price €1.181,00
Current price €891,00
€891,00 - €891,00
Current price €891,00
or Buy now, pay later. Choose Klarna Pay Later / Slice it during checkout.

SKU : FLCM-FLN-MSTR-03

AT A GLANCE


Payload
Up to 12kg
Support Arm Rotation
180°
Waist hip strap length
Min-Max: 87 cm - 107 cm
Compatible With
Camera Gimbals and Handheld Stabilization Setups
Best For
Moving Shots
Vibration Reduction
Handheld Stabilization
Dynamic Camera Movement

Secure checkout | Fast delivery | 30-day returns | 1-year warranty

Flycam Flowline Masterwith Pro Vest

Most comfortable body rig for camera & gimbals.

To support your extensive handheld work, the Flycam Flowline Master with Pro Vest carries camera and gimbal setups from 4 to 12 kg (9 to 27 lb) and spreads the weight across your entire back. A multi-layer padded vest, a 180° rotating top bar and a vibration-reducing Support Rope keep long shoots smooth and comfortable.

4–12 kgPayload (9–27 lb)
180°Top bar rotation
100 cmMounted height
87–107 cmWaist hip strap (34–42 inch)
Camera operator wearing the Flycam Flowline Master with Pro Vest on a city street, holding a cinema camera rig on the Support Rope

01Weight distribution

The most comfortable shooting experience.

We understand extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline Master takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.

NoteIt is recommended to attach the minimum required weight (4 kg / 9 lb) for pulling down the Support Rope to ensure proper operation of your Flycam Flowline system.

ShouldersWeight taken off arms
Entire backWeight redistributed
BreathableBody harness
Camera operator wearing the Flycam Flowline Master with Pro Vest on a night set, with the crew behind

02Padding & fit

The Flowline Master vest.

The Flowline Master Vest has Multiple Layers of Padding which ensures more support around the waist, allowing you to mount large setups and shoot for longer duration comfortably.

It has a flexible belt system & adjustable vest rods on sides which will enable a comfortable fit for all body types.

Multi-layerPadding
FlexibleBelt system
AdjustableVest rods
Camera operator wearing the Flycam Flowline Master with Pro Vest, following a subject across a park with a handheld rig

03Stability

Smoother steadier shots!

The Harness takes the weight off your neck, arms and shoulders, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots.

The Support Rope also adds a point of Contact which reduces Vibrations.

Less fatigueSteady for longer
Support RopeAdds a point of contact
VibrationsReduced
Camera operator wearing the Flycam Flowline Master with Pro Vest on a night shoot, beside the director with a megaphone and the crew

04Payload

Adaptive camera support rig.

This Flowline Master System fits multiple Camera and Gimbal Setups between the weight range of 4 kg / 9 lb to 12 kg / 27 lb. You can even adjust the spring tension to balance the load placed on the Support Rope by turning the knob present on the back of the rig.

Also, the top bar allows for 180° rotation to capture shots with incredible freedom of movement.

Multiple setupsCamera & gimbal
AdjustableSpring tension
Rear knobBalances the load
Camera operator wearing the Flycam Flowline Master with Pro Vest, filming with a cinema camera in a hotel lobby

05Durability

Built to last.

We know set life can take a toll on your gear. Built with the highest quality materials, the Flycam Flowline Master is sure to last you a lifetime.

It comes in a high-quality protective bag that lets you easily carry it with you around the world.

Highest qualityMaterials
ProtectiveCarry bag
Travel-readyAround the world

06Specifications

FLCM-FLN-MSTR-03

Payload CapacityMin-Max: 4 kg - 12 kg (9 lb - 27 lb)
Note: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.
Support Arm Rotation180°
Knob TypeAnti Slip Ratchet Knob
Height Mounted100cm | 39.4inch
Folded: 60cm | 23.6inch
Suspension LineMaterial: 3mm Nylon
Length (Rope): 152.5cm | 60 in When fully stretched
Top BarLength Including Extension: 46cm | 18inch
Length Excluding Extension: 32cm | 13inch
Waist hip strap lengthMin-Max: 87cm - 107cm (34inch-42inch)
Extension Length14cm | 5.5inch
Product Weight (without packing)5.6 kg / 12.5 lb
Product Weight (with packing)28 kg / 61.8 lb

In the box

  1. 01Flycam Flowline Master With Pro Vest (4-12 kg / 9-27 lb)
  2. 02Bag

07Videos

See the Flowline Master with Pro Vest in action.

Flycam Flowline Master Pro Vest with Edge V1 Stabilization Arm - For Camera & Gimbals

Flycam Flowline Master Camera/Gimbal Support Pro Vest + Placid 2-Axis Stabilizing Arm | Review+Shots

Flycam Flowline Master Pro Vest for Camera/Gimbals | Placid Arm | 2-Axis Equalizer | Review + Shots

Guaranteed fast deliveryFor all orders
Quick and efficientCustomer service
Easy returnsUp to 30 days
1-year warrantyOn all products

Newsletter sign-up

You can subscribe without accepting optional cookies.

By selecting Subscribe, you agree to receive Proaim product updates and offers by email. You can unsubscribe at any time. Privacy policy

x