Skip to content
All prices on the website are VAT inclusive. B2B customers with a valid VAT number (except Belgium) can visit at https://business.proaim.be/ to get VAT Free pricing.
All prices on the website are VAT inclusive. B2B customers with a valid VAT number (except Belgium) can visit at https://business.proaim.be/ to get VAT Free pricing.

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

With 180° Rotation

Original price €402,00 - Original price €402,00
Original price
€402,00
€402,00 - €402,00
Current price €402,00
or Buy now, pay later. Choose Klarna Pay Later / Slice it during checkout.

SKU : B-FLCM-FLN-01

AT A GLANCE


Payload
3-7.5 kg
Support Arm Rotation
180°
Waist hip strap length
Min-Max: 81 cm - 125 cm
Compatible With
Camera and Gimbals
Best For
Moving Shots
Vibration Reduction
Handheld Stabilization
Dynamic Camera Movement

Secure checkout | Fast delivery | 30-day returns | 1-year warranty

Flycam Flowline StarterBody support rig

Shoot handheld for longer, without the strain.

The Flycam Flowline Starter is a body support rig for camera and gimbal setups from 3 to 7.5 kg (6 to 16 lb). It takes the weight off your shoulders and arms, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and steadier shots. The Top Bar with 180° Rotation capability allows easy camera movements in different angles, and the Support Rope adds an additional point of contact which reduces vibrations.

NoteIt is recommended to attach the minimum required weight (3kg / 6lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.
3–7.5 kgPayload (6–16 lb)
180°Top bar rotation
3.6 kgComplete Flowline weight
81–125 cmWaist hip strap

Flycam Flowline Starter

Camera operator wearing the Flycam Flowline Starter, filming actors walking along a stone wall

Body harness / Worn

01Comfort

The most comfortable shooting experience.

We understand, extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.

Entire backWeight redistributed
ComfortableBody harness
3 kgMinimum weight (6 lb)

Flycam Flowline Starter

Operator wearing the Flycam Flowline Starter with a gimbal hanging from the top bar

180° rotation / In motion

02Stability

Smoother, steadier shots.

The Harness takes the weight off your arms and shoulder, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Top Bar with 180° Rotation capability allows easy camera movements in different angles. The Support Rope also adds an additional point of Contact which reduces Vibrations.

180°Top bar rotation
Less fatigueSteady for longer
Support ropeReduces vibrations

Flycam Flowline Starter

Crew adjusting the Flycam Flowline Starter on an operator's back

Tension Adjustment Knob

03Versatility

The most versatile camera support rig.

This Flowline System has been designed to accommodate all Camera and Gimbal Setups between 3kg to 7.5kg (6lb / 16lb). The spring tension can be adjusted to balance the load placed on the Support Rope by turning the knob present on the back of the rig.

3–7.5 kgCamera & gimbal setups
SpringBalances the load
Rear knobAdjusts the tension

04Highlights

Details behind the comfort.

01

Comfortable body harness

Carries the weight of your setup across your back.

02

Weight across your back

Takes the weight off your shoulders and arms.

03

180° top bar

Easy camera movement at different angles.

04

Support rope

An extra point of contact that reduces vibrations.

05

3–7.5 kg setups

Accommodates camera and gimbal setups from 6 lb to 16 lb.

06

Spring tension knob

Adjusts the spring tension to balance the load on the support rope.

05Specifications

Payload CapacityMin - Max: 3kg - 7.5kg (6lb - 16lb)NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.
Support Arm Rotation180°
Flowline WeightComplete 3.6kg / 8lb
HeightMounted: 100cm | 39.4inch
Folded: 64cm
Suspension LineMaterial: 3mm Nylon
Length (Rope): 152.5cm | 60inch When fully stretched
Top BarLength: 480mm
Rotation: 180°
Waist hip strap lengthMin-Max: 81cm - 125cm (32 inch - 49 inch)
Product Weight (Without Packing)3.8kg / 8.3lb
Product Volumetric Weight (With Packing)11.5kg / 25.4lb

Dimensions

Flycam Flowline Starter dimensions

In the box

  1. 01Flycam Basic Flowline with 180° Rotation
  2. 02Bag
User manualPDF ↓
Guaranteed fast deliveryFor all orders
Quick and efficientCustomer service
Easy returnsUp to 30 days
1-year warrantyOn all products



  • What camera weight can the Flycam Flowline Starter support?

    The system supports camera and gimbal setups between 3kg and 7.5kg (6lb–16lb)

  • Can beginners use the Flycam Flowline Starter easily?

    Yes, the system features simple spring tension adjustment and a straightforward setup suitable for beginners and professionals.

  • How is camera weight balanced on the Flowline Starter?

    The spring tension knob on the back adjusts resistance to balance the camera weight suspended from the support rope.

  • Can the camera move freely while using the Flowline Starter?

    Yes, the top bar features 180° rotation.

  • Can the Flycam Flowline Starter be used with gimbals?

    Yes, the Flowline Starter supports most gimbals and camera rigs within the 3–7.5kg payload range.

  • What is the minimum camera weight required for proper operation?

    A minimum setup weight of 3kg (6lb) is recommended to properly tension the balancing support rope.

  • what if I will use it with more weight (8kg or 9kg) than it supports? It's possible or what's the risks?

    The weight capacity of B-FLCM-FLN-01 is 3-7.5 kg / 6-16 lb and would recommend to use the camera setup weight in this range to get the perfect and steadier shots.

  • If a customer has a 9-10 lb payload is there a way to adjust the tension so the camera does not keep pulling up?

    Yes, the tension on the Flycam Flowline can be adjusted as shown in the below video:
    https://www.youtube.com/watch?v=GC9uF0SXkz8&t=82s

  • What is the use of washers and velcro you provide with the Flycam flowline starter? You have not shown any use of them

    Regarding your query on the washer and velcro, I would like to inform you that we provide an extra washer so that it can be used with the knob on the back mechanism of the flowline when required.
    For Velcro, it is used to fasten the hook to the arm during packaging (when it is not in use). This prevents it from moving around and getting damaged.

  • What is the size and length of the marked knob of Basic Flowline Stabilizing Support Vest with 180¡?

    M4 X 12MM

  • Hello! Is it possible to lock position of the bar so it will not rotate?

    The Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb) will rotate at 180°. If you want to make the bar static in one position/ direction then you need to hold the camera manually.

Customer Reviews
5.0 Based on 2 Reviews
5 ★
100% 
2
4 ★
0% 
0
3 ★
0% 
0
2 ★
0% 
0
1 ★
0% 
0
Write a Review

Thank you for submitting a review!

Your input is very much appreciated. Share it with your friends so they can enjoy it too!

Filter Reviews:
MP
01/10/2024
Mark P.

Perfect!

Perfect Working, High-Quality Product!

PH
20/03/2023
Patrick H.
France France

Harnais confortable et stabilisation efficace

Conception solide, efficacité et confort d'utilisation

x